Primary Country (Mandatory)

Other Country (Optional)

Set News Language for United States

Primary Language (Mandatory)
Other Language[s] (Optional)
No other language available

Set News Language for World

Primary Language (Mandatory)
Other Language(s) (Optional)

Set News Source for United States

Primary Source (Mandatory)
Other Source[s] (Optional)

Set News Source for World

Primary Source (Mandatory)
Other Source(s) (Optional)
  • Countries
    • India
    • United States
    • Qatar
    • Germany
    • China
    • Canada
    • Singapore
    • World
  • Categories
    • National
    • International
    • Business
    • Entertainment
    • Sports
    • Special
    • All Categories
  • Available Languages for United States
    • English
  • All Languages
    • English
    • Hindi
    • Arabic
    • German
    • Chinese
    • French
  • Sources
    • India
      • AajTak
      • NDTV India
      • The Hindu
      • India Today
      • Zee News
      • NDTV
      • BBC
      • The Wire
      • News18
      • News 24
      • The Quint
      • ABP News
      • Zee News
      • News 24
    • United States
      • CNN
      • Fox News
      • Al Jazeera
      • CBSN
      • NY Post
      • Voice of America
      • The New York Times
      • HuffPost
      • ABC News
      • Newsy
      • USA TODAY
      • NBC News
      • CNBC
    • Qatar
      • Al Jazeera
      • Al Arab
      • The Peninsula
      • Gulf Times
      • Al Sharq
      • Qatar Tribune
      • Al Raya
      • Lusail
    • Germany
      • DW
      • ZDF
      • ProSieben
      • RTL
      • n-tv
      • Die Welt
      • Süddeutsche Zeitung
      • Frankfurter Rundschau
    • China
      • China Daily
      • BBC
      • The New York Times
      • Voice of America
      • Beijing Daily
      • The Epoch Times
      • Ta Kung Pao
      • Xinmin Evening News
    • Canada
      • CBC
      • Radio-Canada
      • CTV
      • TVA Nouvelles
      • Le Journal de Montréal
      • Global News
      • BNN Bloomberg
      • Métro
    • Singapore
      • CNA
      • The Straits Times
      • Lianhe Zaobao
Andhra Pradesh: Lakshmi Parvathi blames Naidu for Polavaram project delay

Andhra Pradesh: Lakshmi Parvathi blames Naidu for Polavaram project delay

The Hindu
Wednesday, June 07, 2023 02:25:54 PM UTC

Andhra Pradesh Telugu and Sanskrit Academy Chairperson Nandamuri Lakshmi Parvathi has alleged that the Polavaram irrigation project is delayed due to the ‘corruption’ by TDP national president and former Chief Minister N. Chandrababu Naidu. Addressing the media here on June 7 (Wednesday), Ms. Lakshmi Parvathi said that Mr. Naidu met Union Home Minister Amit Shah recently to ‘patch up’ with the BJP.

Andhra Pradesh Telugu and Sanskrit Academy Chairperson Nandamuri Lakshmi Parvathi has alleged that the Polavaram irrigation project is delayed due to the ‘corruption’ by TDP national president and former Chief Minister N. Chandrababu Naidu.

Addressing the media here on June 7 (Wednesday), Ms. Lakshmi Parvathi said that Mr. Naidu met Union Home Minister Amit Shah recently to ‘patch up’ with the BJP.

“The TDP president is trying to forge an alliance with the BJP for the 2024 elections. However, it looks unlikely. Had it been the case, the TDP-friendly media houses would have gone out of their way to publish it,” said Ms. Parvathi.

Alleging that Jana Sena Party (JSP) president Pawan Kalyan was playing into the hands of Mr. Naidu, Ms. Parvathi quipped, “Varahi (campaign vehicle of Mr. Pawan Kalyan) moves out of Hyderabad only after Mr. Naidu gives the green signal. Mr. Pawan Kalyan is a good actor but he fell into the trap of Mr. Naidu,” she said.

Ms. Parvathi sounded optimistic about Chief Minister Y.S. Jagan Mohan Reddy’s victory in the 2024 elections. “My husband (NTR) had founded the TDP. But I oppose it now as the party has become corrupt,” she said, adding that she would come out with a book on Mr. Naidu soon.

Likening the Yuva Galam padayatra launched by N. Lokesh to ‘an evening walk’, Ms. Pravathi said that the TDP national general secretary would be ‘left nowhere’ after the elections.

She said that NTR Jr. was doing well in films and that he should better ‘stay there’ for some more time.

Read full story on The Hindu
Share this story on:-
More Related News
Two injured spotted deer under treatment at Wildlife Transit and Treatment Centre in Coimbatore

Two injured spotted deer are receiving care at Coimbatore's Wildlife Transit and Treatment Centre after being rescued from Mettupalayam Forest.

‘Sita Rama Kalyanam’ to begin with turmeric grinding ceremony at Vontimitta on March 25

The 'Sri Sita Rama Kalyana Mahotsavam' festival begins with a turmeric grinding ceremony in Vontimitta on March 25.

VMRDA fast-tracks roads to Bhogapuram airport; `smarter shortcut’ northern Vizag residents

VMRDA fast-tracks roads to Bhogapuram airport, creating a smarter shortcut for northern Vizag residents and boosting local growth.

MVI held in ACB trap, aide on the run in Khammam bribery case

MVI held in ACB trap, aide on the run in Khammam bribery case

Experts stress need for early detection of colorectal cancer

Experts highlight urgent need for increased awareness of colorectal cancer signs, as many remain unaware of early warning signals.

Assam candidate has 37 bank accounts, 32 vehicles

Assam candidate Sewli Mohilary declares 37 bank accounts and 32 vehicles, with assets totalling ₹54.04 crore.

Major Ports Volleyball Tournament starts

The All India Major Ports Volleyball & Beach Volleyball Tournaments 2025–26 at the New Mangalore Port Authority (NMPA) Sports Complex Premises and Panambur Beach were inaugurated on Tuesday, by NMPA Deputy Chairperson S. Shanthi.

EVMs, VVPATs moved to Assembly constituencies after first randomization

EVMs, VVPATs moved to Assembly constituencies after first randomization

MP calls upon artisans to make use of PM Vishwakarma Scheme

B.Y. Raghavendra, MP, urges artisans and youth to utilise the PM Vishwakarma Scheme for a self-reliant future in Shivamogga.

Two arrested for dangerous bike stunts near Telangana Secretariat, Lumbini Park in Hyderabad

Two arrested for dangerous bike stunts near Secretariat, Lumbini Park

Konkan Railway’s merger with Indian Railways essential to address KRCL’s structural problems and development of the West Coast, says Capt. Chowta

Dakshina Kannada Member of Parliament Captain Brijesh Chowta on Tuesday, urged the Union Finance Ministry to give go ahead for the merger of Konkan Railway Corporation Ltd., (KRCL) with the Indian Railways.

Protesters demand cancellation of plans to develop Ooty Race Course into eco-park

Protesters rally against plans to convert Ooty Race Course into an eco-park, citing environmental and legal concerns.

Chaitra Drama Festival to be held in Belagavi

Join the Chaitra Drama Festival in Belagavi, celebrating World Theatre Day with performances and awards from March 27-29.

Fuel shortage fears grip Hyderabad; panic buying chokes petrol pumps

Panic buying, not shortage, is leading to long queues at Hyderabad petrol pumps.

Collector calls for united fight against TB

District Collector urges collective action against TB during World TB Day rally, highlighting screening efforts and patient support initiatives.

Tamil Nadu Assembly election 2026: DMK finalises seat-sharing with allies, likely to contest in 175 seats

DMK finalises seat-sharing for the 2026 Tamil Nadu Assembly elections, contesting 175 seats with allies DMDK and VCK.

Collector, CoP visit voter’s awareness outreach programmes

Collector V. Saravanan and Police Commissioner Kamini promote voter awareness through outreach programs and traditional events in Tiruchi.

Take precautionary measures to prevent road accidents, says DC

Mysuru DC stresses precautionary measures to reduce road accidents, urging officials to identify and address high-risk areas.

Growing influence of Artificial Intelligence highlighted

Growing influence of Artificial Intelligence highlighted

Release funds for Musi and 7,444 km sewerage network: MP in AMRUT review meeting

Telangana MP urges quick approval and funding for Musi River and 7,444 km sewerage projects during AMRUT review meeting.

Former MLA withdraws dharna after Urban Authority issues temporary single site approval

Former Udupi MLA K. Raghupathi Bhat, who had launched an indefinite dharna in front of the Udupi Urban Development Authority (UUDA) office on Monday against the Authority’s alleged illegal refusal to grant single site approval for 1.1 acres of his land at Badanidiyur, ended his dharna on Tuesday.

West Asia crisis: India’s foreign policy is “compromised”, considered a “universal joke”, says LoP Rahul Gandhi

Rahul Gandhi criticizes Modi for referencing COVID-19 during the West Asia crisis, claiming it reflects a compromised foreign policy.

Ongole GGH creates awareness on TB prevention, treatment

Ongole GGH hosts TB awareness program, emphasizing prevention and treatment on World Tuberculosis Day.

Delhi court summons Bishnoi, others in extortion call case

Delhi court summons gangster Lawrence Bishnoi and two others in an extortion call case after previous discharge.

TNNLU student refuses to take down blog critical of Supreme Court

TNNLU student A. Rishi Kumar stands firm against pressure to remove his critical blog on the Supreme Court, gaining widespread support.

© 2008 - 2026 Webjosh  |  News Archive  |  Privacy Policy  |  Contact Us