Primary Country (Mandatory)

Other Country (Optional)

Set News Language for United States

Primary Language (Mandatory)
Other Language[s] (Optional)
No other language available

Set News Language for World

Primary Language (Mandatory)
Other Language(s) (Optional)

Set News Source for United States

Primary Source (Mandatory)
Other Source[s] (Optional)

Set News Source for World

Primary Source (Mandatory)
Other Source(s) (Optional)
  • Countries
    • India
    • United States
    • Qatar
    • Germany
    • China
    • Canada
    • Singapore
    • World
  • Categories
    • National
    • International
    • Business
    • Entertainment
    • Sports
    • Special
    • All Categories
  • Available Languages for United States
    • English
  • All Languages
    • English
    • Hindi
    • Arabic
    • German
    • Chinese
    • French
  • Sources
    • India
      • AajTak
      • NDTV India
      • The Hindu
      • India Today
      • Zee News
      • NDTV
      • BBC
      • The Wire
      • News18
      • News 24
      • The Quint
      • ABP News
      • Zee News
      • News 24
    • United States
      • CNN
      • Fox News
      • Al Jazeera
      • CBSN
      • NY Post
      • Voice of America
      • The New York Times
      • HuffPost
      • ABC News
      • Newsy
      • USA TODAY
      • NBC News
      • CNBC
    • Qatar
      • Al Jazeera
      • Al Arab
      • The Peninsula
      • Gulf Times
      • Al Sharq
      • Qatar Tribune
      • Al Raya
      • Lusail
    • Germany
      • DW
      • ZDF
      • ProSieben
      • RTL
      • n-tv
      • Die Welt
      • Süddeutsche Zeitung
      • Frankfurter Rundschau
    • China
      • China Daily
      • BBC
      • The New York Times
      • Voice of America
      • Beijing Daily
      • The Epoch Times
      • Ta Kung Pao
      • Xinmin Evening News
    • Canada
      • CBC
      • Radio-Canada
      • CTV
      • TVA Nouvelles
      • Le Journal de Montréal
      • Global News
      • BNN Bloomberg
      • Métro
    • Singapore
      • CNA
      • The Straits Times
      • Lianhe Zaobao
‘Hotbed of corruption’: BJP questions AAP for ‘cost overrun’ in construction of additional block at Lok Nayak Hospital

‘Hotbed of corruption’: BJP questions AAP for ‘cost overrun’ in construction of additional block at Lok Nayak Hospital

The Hindu
Thursday, July 04, 2024 05:51:18 PM UTC

The BJP on Wednesday attacked the Aam Aadmi Party (AAP) over allegations of corruption in the construction of an additional block at Delhi government-run Lok Nayak Hospital, calling it a “well-thought out scam”.

The BJP on Wednesday attacked the Aam Aadmi Party (AAP) over allegations of corruption in the construction of an additional block at Delhi government-run Lok Nayak Hospital, calling it a “well-thought out scam”.

“The LNJP Hospital extension scam is a well-thought out scam planned by the then-Public Works Department (PWD) Minister Satyendar Jain. Our inquiry reveals that Mr. Jain, instead of giving a fixed tender, gave tenders on rate-contract basis,” said Delhi BJP president Virendra Sachdeva.

Manish Sisodia and Atishi, who occupied the post after Mr. Jain’s arrest in a money laundering case, were “well aware” of the scam, he said, adding that every time the price of constructing the building escalated, the relevant file was put before their desk.

“It is shocking to see that even as the Public Works Department (PWD) and Health Department have totally failed Delhiites, the concerned Ministers are engaged in dirty blame game politics and seem to have time for everything except improving the performance of their department,” he said, adding that the PWD is a “hotbed of corruption”.

AAP declined to respond to The Hindu’s requests for a comment.

On Tuesday, Lieutenant-Governor V.K. Saxena had asked the Vigilance Department to request the Central Vigilance Commission to probe a “cost overrun” of ₹670 crore in the construction of the additional block at Lok Nayak Hospital. While the PWD attributed the cost overruns to the increase in the scope of work, it was found that while the scope increased by 8.61%, the cost increased by 143%, Raj Niwas officials had said.

Read full story on The Hindu
Share this story on:-
More Related News
No need for govt. sanction to register FIR in alleged cash-for-jobs scam in K.N. Nehru’s dept., A-G tells HC

A-G informs Madras High Court no govt. sanction needed for FIR in K.N. Nehru's cash-for-jobs scam case.

Plea to introduce Beary in schools

President of Karnataka Beary Sahitya Academy U. H. Umar on Wednesday appealed to Madhu Bangarappa, Minister for School Education and Literacy to introduce Beary as the third optional language from Class 6 from the academic year 2026-27.

DSS urges State govt. to implement internal reservation, resolve roster issues

Karnataka Dalit Sangharsha Samiti (DSS) has urged the State government to begin the process of filling up 56,432 posts only after rectifying the mistakes in fixing the roster and implementing the internal reservation among Scheduled Castes.

Rebel nominations strain alliances in Karaikal

Rebel nominations in Karaikal expose tensions within electoral alliances, risking voter fragmentation ahead of the Puducherry Assembly elections.

Consumer protection watchdog directs restaurants, hotels against levying any additional ‘LPG, gas crisis charges’

CCPA prohibits restaurants and hotels from imposing unfair LPG charges, labeling them as unjustified and against consumer protection guidelines.

Over 10,000 handloom weavers in A.P. benefit from NHDP

Andhra Pradesh receives ₹19.47 crore for 44 handloom clusters, benefiting over 10,000 weavers under the National Handloom Development Programme.

Tamil Nadu Assembly election 2026: Constituency Watch – a compilation

Stay updated with The Hindu’s on-ground Tamil Nadu Assembly election coverage and voter insights across key constituencies.

Water level in Mettur dam stands at 82.770 feet

Mettur dam water level reaches 82.770 feet, with inflow at 361 cusecs and discharge at 801 cusecs.

Tamil Nadu Assembly election 2026: Udhagamandalam faces challenges in tourism and tea sectors

Udhagamandalam faces challenges in tourism and tea sectors due to poor infrastructure, pollution, and urbanization ahead of summer season.

Shivamogga activists welcome Bill to stop honour killing

Social activists and journalists from Shivamogga, who placed the demand for a strict law to stop honour killings, have thanked the State government for tabling the Bill and getting it passed in both Houses of the legislature with the support of all other parties.

Untreated waste, poor civic infra mar Erode (East) Assembly constituency

Erode (East) voters prioritize pollution control, traffic solutions, and urban infrastructure as key issues ahead of upcoming elections.

Former Minister T. Jeevan Reddy quits Congress ending his 42-year-old association, slams Chief Minister Revanth Reddy

T. Jeevan Reddy resigns from Congress after 42 years, criticizing party leadership and the influence of defectors.

Kanniyakumari Collector inspects vulnerable and sensitive polling stations

Kanniyakumari Collector inspects vulnerable and sensitive polling stations

Banter over CM’s shawl

A humorous exchange in the Legislative Assembly highlights CM Siddaramaiah's choice of a Mysore silk shawl over a towel.

Karnataka better placed than its progressive neighbour in fiscal deficit: Siddaramaiah

Karnataka's fiscal deficit is under control, better than neighboring states, says Chief Minister Siddaramaiah amid revenue challenges.

Capt. S. Divakar assumes charge as MD and CEO of Dredging Corporation of India

Capt. S. Divakar takes charge as MD and CEO of Dredging Corporation of India, following board approval for his appointment.

Nara Bhuvaneswari inaugurates job mela in Kuppam

Nara Bhuvaneswari inaugurates a job mela in Kuppam, promoting job creation and welfare initiatives for local youth and women.

Residents hoist black flags, threaten to boycott polls in Walajah due to lack of basic facilities

Walajah residents protest by hoisting black flags, threatening to boycott elections over poor civic amenities and infrastructure issues.

Railway Ministry regularises services of Surat-Mangaluru Junction bi-weekly Express Special

The Railway Ministry has decided to regularise the services of Surat-Mangaluru Junction-Surat bi-weekly Special Express along with nine other special trains.

Training held for zonal election officers in Thoothukudi

Training held for zonal election officers in Thoothukudi

BRO has key role in building frontier infrastructure, national security: Defence Minister

Defence Minister highlights BRO's vital role in enhancing border infrastructure, national security, and socio-economic growth in India.

A Century of Excellence: Andhra University celebrates 91st and 92nd convocation

Andhra University celebrates its 91st and 92nd convocations, honoring graduates and distinguished personalities for their contributions and achievements.

Earthen bowls distributed to keep water for birds in summer

Coimbatore students receive earthen bowls to provide water for birds, promoting conservation on World Sparrow Day.

Villagers oppose flyover at Devalapura cross, seek alternative road safety measures

Residents of Hosahundi village in Kasaba hobli of Mysuru taluk have opposed the proposed construction of a flyover at Devalapura Cross on National Highway 275-K (Outer Ring Road), urging the authorities to drop the project and adopt alternative measures to improve road safety.

Telangana head constable’s organ donation gives new lease of life to patients

A brain-dead head constable’s family consented to organ donation under the Jeevandan programme, giving two patients a new lease of life through kidney transplants.

© 2008 - 2026 Webjosh  |  News Archive  |  Privacy Policy  |  Contact Us