
Bengaluru: BBMC to build integrated flyover in Yelahanka; to be ready in 1 year
India Today
The flyover would have four lanes, a down ramp near the college and an up ramp near the police station. The 1.8-km flyover would give vehicle users signal-free passage as it would seamlessly link four traffic junctions
Bruhut Bengaluru Mahanagara Palike (BBMP) is planning to build two flyovers and a railway underbridge in the Yelahanka assembly constituency at a cost of Rs 260 crore.
Yelahanka MLA S R Vishwanath laid the foundation stone for the projects on Saturday and hoped that they would be ready in a year and a half. A detailed project report has been released which says that work on the Rs 175-crore four-lane flyover is likely to be completed in 18 months.
More Related News
