Fourth check dam across Vaigai river to come up near Arapalayam in Madurai
The Hindu
₹11.98 crore project to recharge ground water for 2 km radius
A fourth check dam across Vaigai river within Madurai city limits will come up near Arapalayam to recharge groundwater around 2 km radius in western parts of the city.
Finance Minister Palanivel Thiaga Rajan, along with Madurai North MLA G. Thalapathi, and District Collector, S. Aneesh Sekhar, took part in the bhoomi puja held for constructing the 320-metre-long check dam, on Sunday.
The 1.20-metre-high new structure will help store 1.36 mcft. As part of the project, protection wall will be constructed for 105 metres.
The work at a cost of ₹11.98 crore has been scheduled to be completed in 18 months. “However, we have planned to complete the works before the onset of North East monsoon,” said a Public Works Department engineer.
PWD has already constructed three check dams across the Vaigai river within the city limits – at Kochadai, near A.V. Bridge and Obulapadithurai.
With Vaigai river not having perennial flow of water, the city areas face groundwater shortage, especially during summer.
To overcome this, the PWD has planned groundwater recharge facilities. Shafts will be sunk in the water spread area, i.e. on the upstream side of the check dam.

Although students from Tamil Nadu remain the leading recipients of educational loans across India, there has been a significant decline in the number of active loans they hold. The number of active education loan accounts decreased from 27.4 lakh accounts to about 20.1 lakh in the period. The fall can be mostly attributed to the fall in Tamil Nadu’s numbers.












