Primary Country (Mandatory)

Other Country (Optional)

Set News Language for United States

Primary Language (Mandatory)
Other Language[s] (Optional)
No other language available

Set News Language for World

Primary Language (Mandatory)
Other Language(s) (Optional)

Set News Source for United States

Primary Source (Mandatory)
Other Source[s] (Optional)

Set News Source for World

Primary Source (Mandatory)
Other Source(s) (Optional)
  • Countries
    • India
    • United States
    • Qatar
    • Germany
    • China
    • Canada
    • Singapore
    • World
  • Categories
    • National
    • International
    • Business
    • Entertainment
    • Sports
    • Special
    • All Categories
  • Available Languages for United States
    • English
  • All Languages
    • English
    • Hindi
    • Arabic
    • German
    • Chinese
    • French
  • Sources
    • India
      • AajTak
      • NDTV India
      • The Hindu
      • India Today
      • Zee News
      • NDTV
      • BBC
      • The Wire
      • News18
      • News 24
      • The Quint
      • ABP News
      • Zee News
      • News 24
    • United States
      • CNN
      • Fox News
      • Al Jazeera
      • CBSN
      • NY Post
      • Voice of America
      • The New York Times
      • HuffPost
      • ABC News
      • Newsy
      • USA TODAY
      • NBC News
      • CNBC
    • Qatar
      • Al Jazeera
      • Al Arab
      • The Peninsula
      • Gulf Times
      • Al Sharq
      • Qatar Tribune
      • Al Raya
      • Lusail
    • Germany
      • DW
      • ZDF
      • ProSieben
      • RTL
      • n-tv
      • Die Welt
      • Süddeutsche Zeitung
      • Frankfurter Rundschau
    • China
      • China Daily
      • BBC
      • The New York Times
      • Voice of America
      • Beijing Daily
      • The Epoch Times
      • Ta Kung Pao
      • Xinmin Evening News
    • Canada
      • CBC
      • Radio-Canada
      • CTV
      • TVA Nouvelles
      • Le Journal de Montréal
      • Global News
      • BNN Bloomberg
      • Métro
    • Singapore
      • CNA
      • The Straits Times
      • Lianhe Zaobao
Worker, supply shortages driving construction delays on P.E.I.

Worker, supply shortages driving construction delays on P.E.I.

CBC
Tuesday, January 25, 2022 03:45:09 PM UTC

If you are one of many Prince Edward Islanders waiting to get construction work done, don't expect movement on that front any time soon.

The province's construction industry is continuing to deal with high demand while navigating labour shortages and supply chain delays.

"It's not getting any better, that's for sure," said Sam Sanderson, general manager of the P.E.I. Construction Association.

When it comes to supply issues, it seems no area of the industry is spared. Steel, electronics,  insulation, and some mechanical shortages are all slowing down work. 

Skilled people might be the biggest shortage of all. Sanderson said the industry is still in need of at least 1,000 workers.

"We need to get people to work," Sanderson said.

"We need to do anything and everything we can to encourage people to get into the trades, to look at trades as an option."

A combination of factors is driving business — and business delays — for some sectors in the industry. 

Trevor MacDonald, manager of P.E.I. Emco HVAC distribution, said the increased demand for green energy and changes in home heating and ventilating, has led to a "large-scale demand." 

Previously, he said, P.E.I. had relied on more traditional heating sources. Now, most new builds have some sort of heat pump or other, newer system. 

"Our biggest worry is just being able to supply," MacDonald said. 

Scaling up has been a challenge, he said, and rebates and other incentives only drive demand. 

Supply chain issues have made things even tougher. MacDonald said much of the equipment his company supplies involves small parts coming from far away. 

"With the mass shutdowns of the shipping ports … we have really had to sit down and check our lists and make sure we have enough," he said.

Read full story on CBC
Share this story on:-
More Related News
Liberals' fiscal watchdog nominee vows to hold government's 'feet to the fire'

The Liberal government's nominee to be the next fiscal watchdog insists she'll run an independent and non-partisan ship — even though her candidacy has created a political rift.

Marathon public hearings on blanket rezoning kick off at Calgary city hall

Two years after Calgary city council held its longest public hearing in the city's history, another marathon session began on Monday to tackle the same contentious subject: blanket rezoning.

Quebec resident among 2 pilots killed in crash at New York's LaGuardia airport

Quebec resident Antoine Forest was one of the pilots killed in the Sunday night crash at New York's LaGuardia airport, according to Radio-Canada sources.

Premier Doug Ford's cellphone records at issue as Ontario legislature resumes

Ontario Premier Doug Ford's cellphone records took centre stage as the provincial legislature resumed sitting Monday for the first time since December, with the opposition accusing the premier of having something to hide.

Heritage awards highlight those working to preserve P.E.I. culture and traditions

The P.E.I. Museum and Heritage Foundation hosted its annual heritage awards, recognizing Islanders who help maintain the island's culture and traditions.

Yukon education department faces backlash over plans for another review

A new independent review of Yukon’s education system is receiving pushback from advocates. 

RCMP has failed to recruit enough police officers to meet operational needs: Auditor General

The RCMP has not recruited enough new officers or effectively assigned its members to meet its operational needs, according to a new report from the auditor general — raising concerns about public safety across the country.

Oil prices fall after Trump postpones Iran strikes

Oil prices fell Monday morning after President Donald Trump said the U.S. would hold off on striking Iran’s energy infrastructure amid productive talks between the two countries.

Ford says province will make Billy Bishop Airport 'special economic zone' as it eyes expansion to allow jets

Premier Doug Ford says his government plans to give Toronto's Billy Bishop Airport special designation that would allow the province to bypass municipal and provincial laws as it pushes to expand the runway downtown.

Hyundai owner in Ontario seeks accountability after her kids' car lost power on Highway 401

Jenelle Hughes says she worries every time her two older children take their car to get to Fanshawe College in London, Ont., from their home in Dutton.

Oil prices fall after Trump postpones Iran strikes

Oil prices fell Monday morning after President Donald Trump said the U.S. would hold off on striking Iran’s energy infrastructure amid productive talks between the two countries.

Spring storm expected to bring up to 40 cm of snow to Avalon Peninsula starting Monday evening

While spring technically started late last week, Newfoundland and Labrador isn't free from winter weather just yet.

School buses cancelled in Sudbury, Ont., following major storm cleanup

The Sudbury School Bus Consortium is suspending all school buses in Greater Sudbury as the community continues to clean up following a major storm.

How RCMP spies infiltrated the 1970s Indigenous rights movement

The Mounties called it the "Native extremism program." Today, it sounds like a spy novel.

N.S. judge to rule on proposed $18M Air Canada Halifax crash landing settlement

A judge is expected to rule in June on a proposed settlement for a class-action lawsuit involving a crash landing of an Air Canada flight in Halifax more than a decade ago.

Escaped inmate from Shediac jail has been caught, police say

An inmate who was on the loose after escaping a jail in Shediac has been caught, New Brunswick RCMP said in a press release late Monday afternoon.

Manitoba politicians say goodbye to NDP MLA Amanda Lathlin in emotional tribute

Premier Wab Kinew draped the Manitoba flag over an empty seat as politicians from across the aisle said goodbye to one of their own in an emotional tribute at the legislature on Monday.

3rd overpass on Saskatoon's Circle Drive damaged in less than 3 weeks

Saskatoon police have identified the driver of a vehicle that struck a railway overpass above Circle Drive on Sunday — the third such collision in the city this month.

Residents, feedlot owner lock horns about claim of effluent spill into nearby ditch

People who live near Lac Pelletier say effluent from a nearby cattle feedlot has spilled off the site and into a ditch that feeds into the lake downstream.

Man found guilty of manslaughter, aggravated assault in pair of 2019 central Edmonton stabbings

A man charged in a pair of stabbings in central Edmonton seven years ago has been found guilty of manslaughter. 

Tesla driver caught asleep at wheel during rainy rush hour: RCMP

Police in Metro Vancouver are warning drivers to remain attentive, even in a self-driving vehicle, after ticketing a woman who "appeared to be literally asleep at the wheel" on Highway 1.

How these P.E.I. churches are renovating to make services more accessible

Some century-old churches on P.E.I. are renovating to become more accessible, which includes updates to accommodate many different kinds of needs.

Toronto police launch safety blitz in school zones to crack down on illegal parking

Toronto police headed to school zones Monday as part of a safety blitz following March Break.

Healing centre in Kamloops aims to be safe space for residential school survivors

WARNING: This story details experiences at residential schools.

N.W.T. coroner identifies Nunavut man who died in RCMP custody

The N.W.T. Coroner Service has identified the Nunavut man who died in RCMP custody in Yellowknife last Thursday.

© 2008 - 2026 Webjosh  |  News Archive  |  Privacy Policy  |  Contact Us