Trial run of waste-to-energy plant launched
The Hindu
GVMC officials send 500 tonnes of waste for processing
The trial run of the the Greater Visakhapatnam Municipal Corporation (GVMC) waste- to-energy (WTE) processing plant at Kapuluppada was started here on Saturday. The Greater Visakhapatnam Municipal Corporation (GVMC) officials have sent about 500 tonnes of waste for processing.
GVMC Commissioner G. Srijana flagged off the closed compact vehicle in which the solid waste was sent to the plant. Later, she enquired about functioning of various machinery and checked the plant with the officials. She also planted saplings on the premises.
Pakistan coach Gary Kirsten stated that “not so great decision making” contributed to his side’s defeat to India in the Group-A T20 World Cup clash here on Sunday. The batting unit came apart in the chase, after being well placed at 72 for two. With 48 runs needed from eight overs, Pakistan found a way to panic and lose. “Maybe not so great decision making,” Kirsten said at the post-match press conference, when asked to explain the loss.