Light engine trial conducted on Pamban bridge
The Hindu
Trial run of a light engine was conducted on the century-old Pamban rail bridge after the completion of the strengthening work. Rail traffic on the bridge was suspended from July 15 to enable the stre
Trial run of a light engine was conducted on the century-old Pamban rail bridge after the completion of the strengthening work. Rail traffic on the bridge was suspended from July 15 to enable the strengthening work after the continuous health monitoring system installed in the iron bridge raised an alarm.More Related News
Around 440 MBBS graduates of 2021 are not required to undergo one year of compulsory rural service as per the bond signed by them while joining the medical course through government-quota seats in 2015 as the High Court of Karnataka has said the law, enacted in 2012 for mandatory rural service, remained unenforced for 10 years as it was published in the official gazette only in July 2022.