Light engine trial conducted on Pamban bridge
The Hindu
Trial run of a light engine was conducted on the century-old Pamban rail bridge after the completion of the strengthening work. Rail traffic on the bridge was suspended from July 15 to enable the stre
Trial run of a light engine was conducted on the century-old Pamban rail bridge after the completion of the strengthening work. Rail traffic on the bridge was suspended from July 15 to enable the strengthening work after the continuous health monitoring system installed in the iron bridge raised an alarm.More Related News













