KRFB to soon decide on building bridge at Kathrikadavu
The Hindu
NH Bypass-Thammanam-Pullepady-M.G. Road corridor slated to be widened into four-lane stretch
The Kerala Road Fund Board (KRFB) will shortly take a call on building a bridge at Kathrikadavu, across the Kaloor-Kadavanthra Road, to ensure smooth flow of vehicles on NH Bypass-Thammanam-Pullepady-M.G. Road corridor which is slated to be widened into a four-lane stretch. The project preparation unit will suggest whether a four-lane bridge is necessary here or whether a traffic island or roundabout will serve the purpose for now. The alignment of the proposed corridor passed through less than 50 m away from the northern end of Kathrikadavu bridge on the Kaloor-Kadavanthra Road, said sources. Greater Cochin Development Authority (GCDA) Chairman V. Salim said a four-lane overbridge would be ideal at the junction.More Related News