NTPC commissions 162 MW solar capacity in Ettayapuram
The Hindu
With this, standalone installed and commercial capacity of NTPC has reached 57,801.27 MW
State-run power giant NTPC on December 10 said it has commissioned 162.27 MW of solar power capacity at Ettayapuram in Tamil Nadu.
"Consequent upon successful commissioning, first part capacity of 162.27 MW out of 230 MW Ettayapuram Solar PV Project at Tamil Nadu, is declared on Commercial Operation w.e.f. 12:00 Hrs. of 10.12.2022," it said in a BSE filing.
With this, standalone installed and commercial capacity of NTPC has reached 57,801.27 MW, while group installed and commercial capacity stands at 70,416.27 MW, it stated.
Flight AI177 will depart Bengaluru at 1.05 p.m. and arrive at London Gatwick at 7.05 p.m. (local time). From London Gatwick, flight AI178 will depart at 8.35 p.m. (local time) and arrive in Bengaluru at 10.50 a.m. (next day arrival). From Bengaluru, the flight will operate on Mondays, Wednesdays, Thursdays, Fridays and Sundays.