Primary Country (Mandatory)

Other Country (Optional)

Set News Language for United States

Primary Language (Mandatory)
Other Language[s] (Optional)
No other language available

Set News Language for World

Primary Language (Mandatory)
Other Language(s) (Optional)

Set News Source for United States

Primary Source (Mandatory)
Other Source[s] (Optional)

Set News Source for World

Primary Source (Mandatory)
Other Source(s) (Optional)
  • Countries
    • India
    • United States
    • Qatar
    • Germany
    • China
    • Canada
    • Singapore
    • World
  • Categories
    • National
    • International
    • Business
    • Entertainment
    • Sports
    • Special
    • All Categories
  • Available Languages for United States
    • English
  • All Languages
    • English
    • Hindi
    • Arabic
    • German
    • Chinese
    • French
  • Sources
    • India
      • AajTak
      • NDTV India
      • The Hindu
      • India Today
      • Zee News
      • NDTV
      • BBC
      • The Wire
      • News18
      • News 24
      • The Quint
      • ABP News
      • Zee News
      • News 24
    • United States
      • CNN
      • Fox News
      • Al Jazeera
      • CBSN
      • NY Post
      • Voice of America
      • The New York Times
      • HuffPost
      • ABC News
      • Newsy
      • USA TODAY
      • NBC News
      • CNBC
    • Qatar
      • Al Jazeera
      • Al Arab
      • The Peninsula
      • Gulf Times
      • Al Sharq
      • Qatar Tribune
      • Al Raya
      • Lusail
    • Germany
      • DW
      • ZDF
      • ProSieben
      • RTL
      • n-tv
      • Die Welt
      • Süddeutsche Zeitung
      • Frankfurter Rundschau
    • China
      • China Daily
      • BBC
      • The New York Times
      • Voice of America
      • Beijing Daily
      • The Epoch Times
      • Ta Kung Pao
      • Xinmin Evening News
    • Canada
      • CBC
      • Radio-Canada
      • CTV
      • TVA Nouvelles
      • Le Journal de Montréal
      • Global News
      • BNN Bloomberg
      • Métro
    • Singapore
      • CNA
      • The Straits Times
      • Lianhe Zaobao
2 years behind schedule, the Pattullo Bridge replacement nears completion 

2 years behind schedule, the Pattullo Bridge replacement nears completion 

CBC
Friday, June 20, 2025 02:14:12 PM UTC

An 80-metre gap is all that separates the main bridge deck from the north ramp of B.C.'s Pattullo Bridge replacement. High above the Fraser River, construction crews work to connect the two sides, one rebar at a time.

The space may look vast, but engineer Wendy Itagawa says it's a relatively small section of the bridge's 1,200-metre length.

"We're getting really close now," said Itagawa, who is the executive director of the Pattullo Bridge Replacement Project. "We're installing the cables and the deck, and we'll be connecting to the north side later this summer."

The project broke ground in 2020 and has faced years of delays, but Itagawa says it's on track now for its fall 2025 opening. 

About 450 people regularly work on the $1.673-billion infrastructure project, which will replace the aging Pattullo Bridge that connects New Westminster and Surrey. 

Built in the 1930s, the Pattullo Bridge serves about 60,000 drivers daily. But over the past two decades, concerns over the bridge's safety and integrity have mounted. 

In 2016, a report presented to TransLink's board of directors showed the bridge did not meet modern wind and seismic safety standards. The report to Metro Vancouver's transit authority recommended the bridge be replaced by no later than 2024. 

The province greenlit a new bridge in 2018. Two years later, in 2020, a team of contractors collectively known as the Fraser Crossing Partners was awarded a $967.5-million contract to replace the bridge. Construction began that February. 

About a year into construction, the opening of the bridge was delayed from 2023 to 2024. At the time, the government attributed delays to on-site investigative work and permitting holdups due to the COVID-19 pandemic.

Last year, it was delayed until fall 2025, with officials citing inflationary pressures and global supply issues. The province also said the 167-metre bridge tower, the tallest of it's kind in B.C., took longer to build than expected.

The current Pattullo Bridge has four lanes of traffic. Opposing directions of traffic are divided by plastic stakes and pedestrians and cyclists share a single sidewalk crossing the bridge. 

Over the years, Surrey and New Westminster have been at odds over how many lanes the replacement should have, with Surrey advocating for a six-lane bridge, but New Westminster wanting to maintain four. 

The province says the replacement bridge will have four lanes, a decision made following community consultation and based on current road network capacity limits. However, the bridge is wide enough to be expanded into six lanes in the future.

There will be dedicated walking and bike paths on both sides of the bridge, along with a centre median.

Read full story on CBC
Share this story on:-
More Related News
Alberta man challenges U.K. extradition order for historical child sexual abuse allegations

An 87-year-old Alberta man is fighting extradition to the United Kingdom to stand trial for historical allegations of physical and sexual assault involving minors.

Why First Nations in B.C. are buying up casinos

Eight casinos across southwest B.C. have been sold to First Nations in the last two years, with the province's gambling scene set to be reshaped as a result.

Junos week is here. Here's what you need to know, from road closures to free music shows

Hamilton hosts the Junos Sunday, and the musical awards show is bringing tourists, musicians, concerts and a ton of themed events to the city this week.

Confidential contract between feds, Stellantis reveals Brampton factory and worker terms

The multi-million-dollar deal at the heart of a high-profile fight between the Canadian government and one of the world’s biggest carmakers contains multiple clauses about the company’s footprint in Ontario, according to a copy obtained by CBC Windsor. 

Why enforcement sweeps are unlikely to fix Calgary’s downtown disorder

In recent months, Calgary police have carried out three day-long safety blitzes, parading out dozens of officers to flood an area with their increased presence — at least, temporarily.

Canadian working group plans to look at ways to improve recovery of forests after wildfires

A national organization is seeking people with experience in Canada's forestry sector as they put together a working group that will examine ways to improve forest recovery following wildfires.

Dual citizens weigh Trump, taxes in decision to renounce U.S. citizenship

Ella Heyder is bracing for a breakup, even though she already moved out decades ago.

Coke Canada Bottling terminates worker injured on the job, says keeping him would be too hard on the company

Shawne Hopkins never saw it coming.

Doug Ford prepares to unveil 8th Ontario budget amid economic uncertainty

Politicians return to Queen’s Park Monday for a shortened spring session, as Premier Doug Ford prepares to unveil his eight budget amid heightened global economic uncertainty.

There's weight to World Water Day in Indigenous community still waiting for clean drinking water

Despite a recent announcement that a water supply pipeline will be build in Oneida Nation of the Thames, some members of the community say that's no excuse for taking water for granted.

Amid the ex-prince Andrew scandal, scrutiny falls on daughters Beatrice and Eugenie

As scandal has swirled around former prince Andrew Mountbatten-Windsor, questions and curiosity have also focused on his ex-wife, Sarah Ferguson, and their daughters, Princesses Beatrice and Eugenie.

Spring snowstorm expected to hit eastern Newfoundland Monday evening

Friday may have been the first day of spring, but winter storms are not over yet for Newfoundland.

Welcome to spring. More snow to start week in Nova Scotia

While we officially welcomed spring last week, an incoming system will be a reminder that snow is still very much part of the new season, especially early on.

Heritage awards highlight those working to preserve P.E.I. culture and traditions

The P.E.I. Museum and Heritage Foundation hosted its annual heritage awards, recognizing Islanders who help maintain the island's culture and traditions.

Yukon education department faces backlash over plans for another review

A new independent review of Yukon’s education system is receiving pushback from advocates. 

RCMP has failed to recruit enough police officers to meet operational needs: Auditor General

The RCMP has not recruited enough new officers or effectively assigned its members to meet its operational needs, according to a new report from the auditor general — raising concerns about public safety across the country.

Oil prices fall after Trump postpones Iran strikes

Oil prices fell Monday morning after President Donald Trump said the U.S. would hold off on striking Iran’s energy infrastructure amid productive talks between the two countries.

Ford says province will make Billy Bishop Airport 'special economic zone' as it eyes expansion to allow jets

Premier Doug Ford says his government plans to give Toronto's Billy Bishop Airport special designation that would allow the province to bypass municipal and provincial laws as it pushes to expand the runway downtown.

Hyundai owner in Ontario seeks accountability after her kids' car lost power on Highway 401

Jenelle Hughes says she worries every time her two older children take their car to get to Fanshawe College in London, Ont., from their home in Dutton.

Oil prices fall after Trump postpones Iran strikes

Oil prices fell Monday morning after President Donald Trump said the U.S. would hold off on striking Iran’s energy infrastructure amid productive talks between the two countries.

Spring storm expected to bring up to 40 cm of snow to Avalon Peninsula starting Monday evening

While spring technically started late last week, Newfoundland and Labrador isn't free from winter weather just yet.

School buses cancelled in Sudbury, Ont., following major storm cleanup

The Sudbury School Bus Consortium is suspending all school buses in Greater Sudbury as the community continues to clean up following a major storm.

Halifax landlords owning thousands of units report lower annual rent increases in 2025

Two large corporate landlords owning a combined 9,008 rental units in Halifax are reporting smaller annual increases in their average rents for 2025 than the previous year.

N.B., feds strike deal on sales tax compensation

The Holt government has reached a deal with Ottawa on compensation for tens of millions of dollars in lost sales tax revenue from the Christmas season in 2024.

Sask. shortens non-resident game bird season to address illegal waterfowl hunting

The government of Saskatchewan has announced plans to reduce the length of non-resident game bird hunting licences to combat illegal guiding. 

© 2008 - 2026 Webjosh  |  News Archive  |  Privacy Policy  |  Contact Us