Primary Country (Mandatory)

Other Country (Optional)

Set News Language for United States

Primary Language (Mandatory)
Other Language[s] (Optional)
No other language available

Set News Language for World

Primary Language (Mandatory)
Other Language(s) (Optional)

Set News Source for United States

Primary Source (Mandatory)
Other Source[s] (Optional)

Set News Source for World

Primary Source (Mandatory)
Other Source(s) (Optional)
  • Countries
    • India
    • United States
    • Qatar
    • Germany
    • China
    • Canada
    • Singapore
    • World
  • Categories
    • National
    • International
    • Business
    • Entertainment
    • Sports
    • Special
    • All Categories
  • Available Languages for United States
    • English
  • All Languages
    • English
    • Hindi
    • Arabic
    • German
    • Chinese
    • French
  • Sources
    • India
      • AajTak
      • NDTV India
      • The Hindu
      • India Today
      • Zee News
      • NDTV
      • BBC
      • The Wire
      • News18
      • News 24
      • The Quint
      • ABP News
      • Zee News
      • News 24
    • United States
      • CNN
      • Fox News
      • Al Jazeera
      • CBSN
      • NY Post
      • Voice of America
      • The New York Times
      • HuffPost
      • ABC News
      • Newsy
      • USA TODAY
      • NBC News
      • CNBC
    • Qatar
      • Al Jazeera
      • Al Arab
      • The Peninsula
      • Gulf Times
      • Al Sharq
      • Qatar Tribune
      • Al Raya
      • Lusail
    • Germany
      • DW
      • ZDF
      • ProSieben
      • RTL
      • n-tv
      • Die Welt
      • Süddeutsche Zeitung
      • Frankfurter Rundschau
    • China
      • China Daily
      • BBC
      • The New York Times
      • Voice of America
      • Beijing Daily
      • The Epoch Times
      • Ta Kung Pao
      • Xinmin Evening News
    • Canada
      • CBC
      • Radio-Canada
      • CTV
      • TVA Nouvelles
      • Le Journal de Montréal
      • Global News
      • BNN Bloomberg
      • Métro
    • Singapore
      • CNA
      • The Straits Times
      • Lianhe Zaobao
US officials went line-by-line through arms shipments to Israel with defense minister to rebut Netanyahu’s delay claim

US officials went line-by-line through arms shipments to Israel with defense minister to rebut Netanyahu’s delay claim

CNN
Wednesday, June 26, 2024 07:20:14 PM UTC

American officials went through a line-by-line explanation of hundreds of US weapons shipments to Israel in meetings this week with the country’s defense minister in a bid to rebut claims from Prime Minister Benjamin Netanyahu that President Biden was delaying military assistance.

American officials went through a line-by-line explanation of hundreds of US weapons shipments to Israel in meetings this week with the country’s defense minister in a bid to rebut claims from Prime Minister Benjamin Netanyahu that President Joe Biden was delaying military assistance. The meetings with Defense Minister Yoav Gallant came amid a growing spat between the Biden administration and Netanyahu, who has claimed that armaments are being delayed to the intense frustration of Washington. US officials meeting Gallant this week brought in experts from across the government to engage in “professional to professional” discussions that ticked through in exacting detail the current state of munitions shipments. “We had a very good opportunity to sit down with experts from across our system and go through every single case,” a senior US administration official said. “This is one of the most complex security partnerships we have, one of the most multifaceted.” The official attributed Netanyahu’s claims – made multiple times over the course of the last week, including in a video in English released on social media – to “misunderstandings” on the Israelis’ part. “There’s stuff happening literally every day across the US government and across the Israeli system, and we were able to go through everything,” the official said, adding the US was able to clarify the status of certain shipments as they make their way through a complex delivery process.

Read full story on CNN
Share this story on:-
More Related News
The US Senate could soon set a historic first: Three Black women serving at the same time

In the days after winning the Democratic nomination for Senate, Illinois Lt. Gov. Juliana Stratton spoke to the two women with whom she could make history next year.

A look at the fireworks company that sold products to two suspected terrorists this month

This month, terrorist suspects in the alleged bomb-throwing in New York City and the synagogue attack in Michigan visited Phantom Fireworks stores shortly beforehand.

Inside Trump’s most difficult war decision yet: whether to put boots on the ground in Iran

In near-daily briefings with top military officials at the White House, President Donald Trump has reviewed options that include sending American troops into Iran.

With casino empire gone, Trump family bets on prediction markets

With his Atlantic City casinos in duress in the 1990s, Donald Trump saw a potential lifeline in sports betting and aggressively campaigned to legalize it in New Jersey. But when state powerbrokers shut him down, Trump vowed that he’d eventually find a way to win.

TSA workers go unpaid as unpredictable wait times mount during shutdown. Here’s what travelers should know this weekend

Unpaid Transportation Security Administration workers are struggling to stay afloat – and on the job – amid a partial government shutdown that has frustrated travelers inching through security lines that stretch for hours, with wait times only expected to worsen this weekend.

They built success in the US. Now Havana wants them back

As Havana calls on Cuban exiles to invest in the island, many in the United States are rejecting the offer outright, viewing it as a desperate move by a government under mounting pressure.

Talks intensify in Washington to end DHS shutdown as airport delays mount nationwide

After weeks of stalemate — and mounting airport delays nationwide — leaders in both parties are scrambling to work out a deal to reopen the Department of Homeland Security, though it remains unclear if a compromise is in reach.

Why the Trump administration is easing sanctions on certain Iranian oil stockpiles

Trump administration officials are making a desperate push to secure every available barrel of oil amid a worsening energy crisis — even if it means lifting sanctions on the very country that they’re fighting against.

Pentagon policy limiting independent press access is unlawful, judge rules

A federal judge on Friday voided various parts of a restrictive press policy rolled out by Defense Secretary Pete Hegseth last year, ruling that they trampled on the constitutional rights of reporters who seek to cover the US military from within its sprawling headquarters.

Trump reshapes a key US House race by offering a candidate and her husband roles if they drop out

President Donald Trump is reshaping a Colorado Republican primary by offering one of the candidates a role in his administration and returning his endorsement to the incumbent, whom he called a “RINO” just last month.

Lawmakers reckon with question of special treatment at airport security amid DHS shutdown

More than a month into the Department of Homeland Security shutdown, lawmakers on Capitol Hill are reckoning with their own travel privileges amid anxieties the funding crunch could exacerbate issues at already understaffed airports around the country.

Comedian Bill Maher to receive Mark Twain Prize, sources say

TV host and comedian Bill Maher has been chosen to receive the prestigious Mark Twain Prize for American Humor, two sources close to the Kennedy Center told CNN.

Yes, the Iran war is a problem with Trump’s base

Conventional wisdom has set in that President Donald Trump’s base is sticking with him on the Iran war, but he has alienated significant portions of his voters — and risks alienating more.

In Maine’s marquee Senate primary, Janet Mills reaches out to women by raising Graham Platner’s online past

Janet Mills and her allies are counting on a gender gap to narrow Platner’s wide lead ahead of the June 9 primary to decide who will face incumbent Republican Sen. Susan Collins. They are betting that the unfiltered style that has brought Platner widespread attention as someone who could help Democrats reach young men will backfire with women.

The NYC bombing suspects pledged allegiance to ISIS, authorities say. What does that actually mean?

Why do people “pledge allegiance” to a “state” that is no longer a state? And what spurs someone to not just attack innocent people, but to then make a statement of loyalty while doing so?

Trump’s efforts to curb mail-in voting come to the Supreme Court as they falter in Congress

A Supreme Court case examining state deadlines for election ballots sent in the mail is just the tip of the spear in President Donald Trump’s war on mail-in voting.

What’s ahead as Trump threatens to send ICE agents to airports while TSA workers go unpaid during shutdown

As a shrinking number of Transportation Security Administration agents work to keep hourslong security lines moving despite not being paid, President Donald Trump stepped into the fray Saturday, announcing he will send Immigration and Customs Enforcement officers to airports by Monday if Congress doesn’t agree to a plan to end the partial government shutdown.

Trump aims to end the revolution that Fidel Castro started. Can the US and Cuba strike a deal?

Donald Trump wants us to believe that a deal with Cuba is close at hand. After this past week, I am not so sure.

Here are the key developments in the weekslong search for Nancy Guthrie

The search for missing 84-year-old Nancy Guthrie, mother of “Today” show host Savannah Guthrie, has stretched into another anguished week, with mounting pressure on investigators and a family grappling with uncertainty.

Cuba announces second nationwide blackout in less than a week

Cuba’s Ministry of Energy announced Saturday evening that entire island has suffered another electrical blackout, leaving more than 10 million people without power.

Iran launched missiles at US-UK military base in the Indian Ocean. Here’s what that says about its capabilities

Iran’s attempt to strike a US-UK base over 2,000 miles (over 3,000 kilometers) off its coast has renewed questions about Tehran’s military capabilities and how far its missiles can reach.

Robert Mueller, and Trump’s many insensitive comments about people who died

For years, President Donald Trump has offered crass and insensitive comments about people who died – especially his foes. That reached a new level on Saturday.

Robert Mueller, former FBI director and special counsel in Trump-Russia probe, dies

Robert Mueller, the former FBI director who led the historic probe into alleged collusion between Donald Trump’s 2016 campaign and the Russian government, has died. He was 81.

Trauma in the classroom: Minneapolis administrator says life after immigration surge is forever changed

Marlon Batres is not OK. The assistant principal says he is in constant fear for his students, staff and even himself after federal agents swarmed the streets.

MAGA says the SAVE America Act is crucial. A new poll shows Americans don’t agree

To hear some prominent MAGA voices tell it, the marathon Senate debate over the “SAVE America Act” is an existential one for the Republican Party. But the urgency to pass the legislation is not felt by Americans more widely.

© 2008 - 2026 Webjosh  |  News Archive  |  Privacy Policy  |  Contact Us