TCHC renos put West Toronto free meal service at risk: advocates
CBC
A community food centre in the city's west end is due for a renovation, but staff say they weren't meaningfully consulted and the results might come at the expense of locals in need.
The Stop Community Food Centre (SCFC) says it's been told to clear out its drop-in meal space by June 3 to make way for an upgraded kitchen and recreation space, along with an additional washroom. The centre's landlord, Toronto Community Housing (TCHC), said the changes are necessary to meet accessibility standards under provincial law.
But Shae London, executive director of the centre, said the renovations will temporarily displace their programming and potentially make it harder to operate normally when they return, by changing the layout of their drop-in area. The changes will ultimately make it more difficult to serve the 60,000 meals free meals they serve each year, she said.
"It's a little short-sighted, as far as I can tell," said London.
"We definitely don't want the message to be that we're anti or against the accessibility upgrades. What we're trying to do is find a happy medium."
The project came to the centre's attention in the summer of 2021, but London says there has been little engagement and collaboration with TCHC on the design since.
But she's hopeful there's time to stall construction and come up with a new blueprint that'll make their space more accessible while keeping programming in tact. The centre started an online petition with more than 1,700 signatures as of Thursday in its bid to convince TCHC to do just that.
"We just want to get back to the table with Toronto Community Housing," she said.
In an email to CBC Toronto, TCHC said renovations at 1884 Davenport Rd. are needed to help meet standards outlined in the mandatory Accessibility for Ontarians with Disabilities Act, which aims to makes the province accessible by 2025.
Its tenant advisory committee also identified "several tenant challenges." Currently 210 tenants live in the same building that houses The Stop, including 13 with accessibility needs.
"TCHC recognizes the important work that The Stop does in the Davenport community, including providing services to some of our tenants," TCHC said.
"TCHC staff are actively working with The Stop staff, and we remain committed to doing our best to minimize the disruption during construction for our tenants and our community partners," it said.
TCHC said staff have met with The Stop to "work together" to find ways to keep the drop-in meal program going during construction and have offered them alternative space at a nearby building, as well as a rent abatement to compensate the move.
The city agency says while construction is slated to start this year, there isn't currently an exact start date. It's projected to last about six months, it said.