Primary Country (Mandatory)

Other Country (Optional)

Set News Language for United States

Primary Language (Mandatory)
Other Language[s] (Optional)
No other language available

Set News Language for World

Primary Language (Mandatory)
Other Language(s) (Optional)

Set News Source for United States

Primary Source (Mandatory)
Other Source[s] (Optional)

Set News Source for World

Primary Source (Mandatory)
Other Source(s) (Optional)
  • Countries
    • India
    • United States
    • Qatar
    • Germany
    • China
    • Canada
    • Singapore
    • World
  • Categories
    • National
    • International
    • Business
    • Entertainment
    • Sports
    • Special
    • All Categories
  • Available Languages for United States
    • English
  • All Languages
    • English
    • Hindi
    • Arabic
    • German
    • Chinese
    • French
  • Sources
    • India
      • AajTak
      • NDTV India
      • The Hindu
      • India Today
      • Zee News
      • NDTV
      • BBC
      • The Wire
      • News18
      • News 24
      • The Quint
      • ABP News
      • Zee News
      • News 24
    • United States
      • CNN
      • Fox News
      • Al Jazeera
      • CBSN
      • NY Post
      • Voice of America
      • The New York Times
      • HuffPost
      • ABC News
      • Newsy
      • USA TODAY
      • NBC News
      • CNBC
    • Qatar
      • Al Jazeera
      • Al Arab
      • The Peninsula
      • Gulf Times
      • Al Sharq
      • Qatar Tribune
      • Al Raya
      • Lusail
    • Germany
      • DW
      • ZDF
      • ProSieben
      • RTL
      • n-tv
      • Die Welt
      • Süddeutsche Zeitung
      • Frankfurter Rundschau
    • China
      • China Daily
      • BBC
      • The New York Times
      • Voice of America
      • Beijing Daily
      • The Epoch Times
      • Ta Kung Pao
      • Xinmin Evening News
    • Canada
      • CBC
      • Radio-Canada
      • CTV
      • TVA Nouvelles
      • Le Journal de Montréal
      • Global News
      • BNN Bloomberg
      • Métro
    • Singapore
      • CNA
      • The Straits Times
      • Lianhe Zaobao
Nearly finished Guelph police HQ sees staff return and cost overruns
Nearly finished Guelph police HQ sees staff return and cost overruns
Nearly finished Guelph police HQ sees staff return and cost overruns
Nearly finished Guelph police HQ sees staff return and cost overruns
Nearly finished Guelph police HQ sees staff return and cost overruns
Nearly finished Guelph police HQ sees staff return and cost overruns
Nearly finished Guelph police HQ sees staff return and cost overruns
Nearly finished Guelph police HQ sees staff return and cost overruns
Nearly finished Guelph police HQ sees staff return and cost overruns
Nearly finished Guelph police HQ sees staff return and cost overruns

Nearly finished Guelph police HQ sees staff return and cost overruns Nearly finished Guelph police HQ sees staff return and cost overruns Nearly finished Guelph police HQ sees staff return and cost overruns Nearly finished Guelph police HQ sees staff return and cost overruns Nearly finished Guelph police HQ sees staff return and cost overruns Nearly finished Guelph police HQ sees staff return and cost overruns Nearly finished Guelph police HQ sees staff return and cost overruns Nearly finished Guelph police HQ sees staff return and cost overruns Nearly finished Guelph police HQ sees staff return and cost overruns Nearly finished Guelph police HQ sees staff return and cost overruns

Global News
Tuesday, August 02, 2022 02:54:33 AM UTC

Three years behind schedule and $2.7 million over budget, the newly renovated headquarters for the Guelph Police Service is ready for officers and staff to move in.

The Guelph Police Service is down to the finishing touches in the renovation of its general headquarters.

Completing the project took three years longer than expected, and cost $2.7 million more than was budgeted, but officers and staff are now back at the main office in the city’s downtown.

In a news release, project manager Ken VanderWal said the city acknowledged that the work on the building took a bit longer than expected but are pleased with the work that the contractor did to address the deficiencies and finished the project.

READ MORE: Guelph removes general contractor from delayed police headquarters project

Supply chain issues, COVID-19, and geotechnical complications were just some of the issues that the city faced.

VanderWal said that the city learned a lot about renovating an occupied building, but rigorous project management processes allowed it to navigate a challenging situation.

The final cost of the project is expected to be eight per cent over the planned $34.1-million budget.

The City of Guelph said the cost overruns will be covered through development charges and taxes.

Read full story on Global News
Share this story on:-
More Related News
‘We’ll never know why’: Former CEO recalls fatal B.C. ferry sinking 20 years later

A former BC Ferries CEO says the Queen of the North sinking remains ‘disturbing’ 20 years later. The ferry struck an island in Wright Sound on March 22, 2006. Two people died.

Tumbler Ridge, B.C., and Taber, Alta. named top 2 Hockeyville finalists

The 2026 Kraft Hockeyville top two contestants have been named. The winner receives $250,000 for ice rink upgrades, and the runner-up will receive a prize worth about $100,000.

MPs to question federal budget watchdog nominee as role remains unfilled

The Office of the Parliamentary Budget Officer scrutinizes federal spending decisions and helps to cost out campaign proposals during elections.

A close-up look at the service dogs who make life better in Saskatchewan

Man’s best friend is proving to be a true lifeline. All across Saskatchewan, service dogs are providing essential, life-changing support every day.

Parts of Nova Scotia, Quebec get early spring blast of snow

Two days after the first day of spring, parts of Atlantic Canada and Quebec will see another blast of winter with Environment Canada forecasting several centimetres of snow.

UNESCO recognizes Maritime historical groups for Black Loyalist archive

UNESCO recognized several Maritime historical groups including the executive director of the Black Loyalist Heritage Centre for their work on the Black Loyalist archive.

Canadians on humanitarian mission in Cuba say residents ‘tired’ amid blackouts

Aid shipments are beginning to arrive in Cuba and a Russian oil delivery is expected this month, but fuel shortages remain critical.

Fréchette and Drainville face off in first CAQ leadership debate

Tensions flared as CAQ leadership rivals clashed over Quebec’s “third link” project in the first debate to replace Premier François Legault.

Man faces second-degree murder charge in suspicious death of Toronto woman

Toronto police have charged a 60-year-old man with second-degree murder in connection with the death of Xian Wei Shao, whose remains were discovered in a north end home last week.

ANALYSIS: Carney promised spending cuts — but not all cuts are equal

Finance Minister François-Philippe Champagne says the government has found ways to cut spending by $60 billion but cautions that published spending cuts require important context.

3 Canadians back home after being stranded on cargo ship in Strait of Hormouz

Three Canadians from Quebec who were stranded in the Persian Gulf since Feb. 28 have returned home following a coordinated repatriation effort.

Federal departments, agencies to shed 12,000 full-time equivalent positions

Federal departments announced that they plan to cut more than 12,000 jobs over three years as part of the Carney government’s spending review plan.

A ‘lone actor’ attack on Jewish Canadians is ‘realistic’ risk: report

Canada’s Integrated Threat Assessment Centre says the U.S.-Israeli war against Iran has heightened an already present threat against Jewish Canadians and public officials.

‘Landmark’ Quebec ruling states no-pet clause violates Charter rights

Renters in Quebec may soon have final say over whether they're allowed to keep pets in their homes following a legal ruling that no-pet clauses in leases violate Charter rights.

Truck found, but suspect in QEII shooting that killed Edmonton man still at large

Alberta RCMP say they have located a Grey 2022 Ford F-150 involved in the fatal highway shooting of an Edmonton man earlier this month. The suspect remains at large.

Ontario education minister promises ‘significant change’ still coming to school boards

Education Minister Paul Calandra, however, said he won't use the notwithstanding clause if he moves to eliminate trustees in Ontario.

ICE is at U.S. airports: What to know if you’re travelling as a Canadian

U.S. President Donald Trump said on Sunday that he would order federal immigration agents to airports to assist TSA. Canadians landing the U.S. should be prepared.

3rd Saskatoon overpass hit by vehicle in a month

Three overpasses in Saskatoon have been hit in the past three weeks, with charges announced against the driver in the first incident.

Canada’s international student program lacks crucial controls: audit

Auditor General Karen Hogan says there are critical weaknesses in the integrity controls for the International Student Program.

Canadian resident trips to U.S. plunge by 22% year over year

Return trips by Canadian residents from the U.S. fell 22 per cent in January compared with a year earlier, according to the latest data.

What’s at stake in 3 upcoming byelections for the House of Commons

Three byelections are being held on April 13 and the results could have an impact on both the makeup of Parliament and how long it lasts.

Ontario legislature resumes; questions on transparency, OSAP expected

Ontario's provincial members of parliament are heading back to Queen's Park Monday, as the legislature sits for the first time since December.

House of Commons returns as Iran war continues and audit reports due

Members of Parliament are back in the House of Commons today, where the government is expected to face tough questions about new auditor general reports and the war in Iran.

2 Air Canada pilots dead after flight from Montreal crashes at LaGuardia Airport

Two Air Canada pilots are dead after their flight originating from Montreal collided with a fire truck at New York’s LaGuardia Airport Sunday night.

Crews in water-logged Metro Vancouver prepare for next drenching

With more rain in the forecast, crews continue to deal with a mudslide earlier this week that covered a road in Coquitlam in debris, posing risk to Metro Vancouver's water supply.

© 2008 - 2026 Webjosh  |  News Archive  |  Privacy Policy  |  Contact Us