Primary Country (Mandatory)

Other Country (Optional)

Set News Language for United States

Primary Language (Mandatory)
Other Language[s] (Optional)
No other language available

Set News Language for World

Primary Language (Mandatory)
Other Language(s) (Optional)

Set News Source for United States

Primary Source (Mandatory)
Other Source[s] (Optional)

Set News Source for World

Primary Source (Mandatory)
Other Source(s) (Optional)
  • Countries
    • India
    • United States
    • Qatar
    • Germany
    • China
    • Canada
    • World
  • Categories
    • National
    • International
    • Business
    • Entertainment
    • Sports
    • Special
    • All Categories
  • Available Languages for United States
    • English
  • All Languages
    • English
    • Hindi
    • Arabic
    • German
    • Chinese
    • French
  • Sources
    • India
      • AajTak
      • NDTV India
      • The Hindu
      • India Today
      • Zee News
      • NDTV
      • BBC
      • The Wire
      • News18
      • News 24
      • The Quint
      • ABP News
      • Zee News
      • News 24
    • United States
      • CNN
      • Fox News
      • Al Jazeera
      • CBSN
      • NY Post
      • Voice of America
      • The New York Times
      • HuffPost
      • ABC News
      • Newsy
    • Qatar
      • Al Jazeera
      • Al Arab
      • The Peninsula
      • Gulf Times
      • Al Sharq
      • Qatar Tribune
      • Al Raya
      • Lusail
    • Germany
      • DW
      • ZDF
      • ProSieben
      • RTL
      • n-tv
      • Die Welt
      • Süddeutsche Zeitung
      • Frankfurter Rundschau
    • China
      • China Daily
      • BBC
      • The New York Times
      • Voice of America
      • Beijing Daily
      • The Epoch Times
      • Ta Kung Pao
      • Xinmin Evening News
    • Canada
      • CBC
      • Radio-Canada
      • CTV
      • TVA Nouvelles
      • Le Journal de Montréal
      • Global News
      • BNN Bloomberg
      • Métro
Malahat highway flood repairs to begin this spring: B.C. government

Malahat highway flood repairs to begin this spring: B.C. government

CTV
Monday, March 28, 2022 06:27:23 PM UTC

Permanent repairs are set to begin this spring on a flood-damaged section on the Trans-Canada Highway on Vancouver Island.

The Ministry of Transportation and Infrastructure announced Monday it has posted a tender for bids to repair the section of the Malahat highway that washed out amid flooding in November.

The project will involve restoring 50 metres of the northbound lane at Tunnel Hill, north of Finlayson Arm Road, as well as replacing an 80-metre retaining wall and repairing the drainage system and ensuring slope stability.

The province says the fix is the first of the permanent repairs planned in the wake of the historic flooding across parts of Vancouver Island and southwestern B.C. last fall.

"All permanent repair projects will improve resilience to future extreme weather events, part of the province’s commitment to building back better to ensure B.C.'s infrastructure is better able to withstand the impacts of climate change," the ministry said in a statement.

Construction is expected to begin in the spring with efforts made to minimize traffic delays during peak times and perform work overnight when possible. However, delays are expected, with periods of single-lane alternating traffic and short, intermittent full closures, the province said.

Read full story on CTV
Share this story on:-
More Related News
© 2008 - 2025 Webjosh  |  News Archive  |  Privacy Policy  |  Contact Us