Primary Country (Mandatory)

Other Country (Optional)

Set News Language for United States

Primary Language (Mandatory)
Other Language[s] (Optional)
No other language available

Set News Language for World

Primary Language (Mandatory)
Other Language(s) (Optional)

Set News Source for United States

Primary Source (Mandatory)
Other Source[s] (Optional)

Set News Source for World

Primary Source (Mandatory)
Other Source(s) (Optional)
  • Countries
    • India
    • United States
    • Qatar
    • Germany
    • China
    • Canada
    • Singapore
    • World
  • Categories
    • National
    • International
    • Business
    • Entertainment
    • Sports
    • Special
    • All Categories
  • Available Languages for United States
    • English
  • All Languages
    • English
    • Hindi
    • Arabic
    • German
    • Chinese
    • French
  • Sources
    • India
      • AajTak
      • NDTV India
      • The Hindu
      • India Today
      • Zee News
      • NDTV
      • BBC
      • The Wire
      • News18
      • News 24
      • The Quint
      • ABP News
      • Zee News
      • News 24
    • United States
      • CNN
      • Fox News
      • Al Jazeera
      • CBSN
      • NY Post
      • Voice of America
      • The New York Times
      • HuffPost
      • ABC News
      • Newsy
      • USA TODAY
      • NBC News
      • CNBC
    • Qatar
      • Al Jazeera
      • Al Arab
      • The Peninsula
      • Gulf Times
      • Al Sharq
      • Qatar Tribune
      • Al Raya
      • Lusail
    • Germany
      • DW
      • ZDF
      • ProSieben
      • RTL
      • n-tv
      • Die Welt
      • Süddeutsche Zeitung
      • Frankfurter Rundschau
    • China
      • China Daily
      • BBC
      • The New York Times
      • Voice of America
      • Beijing Daily
      • The Epoch Times
      • Ta Kung Pao
      • Xinmin Evening News
    • Canada
      • CBC
      • Radio-Canada
      • CTV
      • TVA Nouvelles
      • Le Journal de Montréal
      • Global News
      • BNN Bloomberg
      • Métro
    • Singapore
      • CNA
      • The Straits Times
      • Lianhe Zaobao
Legault tells auto board scandal inquiry he only learned of cost overruns in February

Legault tells auto board scandal inquiry he only learned of cost overruns in February

Global News
Tuesday, September 02, 2025 03:33:20 PM UTC

Legault is testifying at a public inquiry examining how the online platform known as SAAQclic cost at least $500 million more than planned.

Quebec Premier François Legault says he only learned about cost overruns at the province’s auto insurance board in February 2025.

Legault is testifying at a public inquiry examining how the online platform known as SAAQclic cost at least $500 million more than planned.

The premier says it’s “not normal” he wasn’t told about the situation before an auditor general’s report in February detailed the overruns.

Legault’s appearance comes after previous testimony at the inquiry suggested his office was reportedly informed as early as 2020 of a risk of ballooning costs.

At least one witness also testified that in September 2022 the province’s top civil servant at the time — Yves Ouellet — was notified of a $222-million shortfall in the online platform.

Legault called the inquiry after Quebec’s auditor general revealed the total cost of the platform would be more than $1.1 billion.

This report by The Canadian Press was first published Sept. 2, 2025.

 

Read full story on Global News
Share this story on:-
More Related News
2 dead after 4 rescued from Ottawa high-rise apartment unit on fire: officials

Ottawa Fire Services said they received multiple calls around 9:30 p.m. Saturday about a fire with people trapped in a high-rise building in the 300 block of Somerset Street West.

Poilievre proposes tariff-free Canada-U.S. auto pact to boost production

Conservative Leader Pierre Poilievre proposed a tariff-free auto pact with the U.S. to revive Canada’s auto sector, at a press conference in Windsor, Ont. on Sunday.

Brawl-filled N.L. junior hockey game a ‘black eye’ on sport after 572 penalty minutes

The vice-president of the St. John's Junior Hockey League, says the violent game was an isolated incident and officials have since handed out suspensions to 18 players and coaches.

Driver dead following shooting on Highway 2 near Leduc, Alta.

Alberta RCMP say just before 3 p.m. Saturday, a pickup truck pulled up beside a Honda Civic on Highway 2 and fired a weapon, resulting in the death of a driver.

2 counter-protesters at Al-Quds Day rally charged with assault: Toronto police

Two men face charges ranging from mischief to assault and harassment following Saturday's Al Quds Day march in Toronto. Police say the suspects were counter-protesters.

Winter’s grip continues across much of Canada; forecasts call for snow, freezing rain

Snow is continuing to fall in parts of Ontario, B.C. and Quebec, with heavy rain and freezing rain expected in some communities in the Maritimes and Ontario.

Quebec maple syrup makers turning to automation, expansion to keep up with demand

As demand for syrup has surged in recent years, Quebec's maple industry is evolving too, adding millions of new taps and turning to automation and better technology.

Canada, Nordic leaders aim to deepen ties as trade being used as ‘coercive tool’

Prime Minister Mark Carney is concluding his time in Norway meeting with that country’s prime minister, along with the leaders of Denmark, Iceland, Sweden and Finland.

2 charged with 1st-degree murder after Burnaby man’s remains found

Two people have been charged with first-degree murder after the remains of Masood Masjoody, reported missing in February, were discovered in Mission, B.C., police say.

Man, teen killed in fatal shooting in Winnipeg

A man and a teenage boy have died after a shooting in Winnipeg’s North End, and police are asking the public for information as the homicide investigation continues.

New café offers taste of Quebec independence

When you walk into the Club Pays coffee shop in Montreal, the first thing you see are the posters with Quebec sovereignty slogans plastered on every wall.

Police identify woman found dead in north Toronto home

Police have identified the woman found dead inside a north Toronto home as 60-year-old Xian Wei Shao. She is believed to be Toronto's fourth homicide victim of 2026.

Charges laid in Toronto-area zipline accident that sent child to hospital

Ontario's public safety regulator has laid charges against the operator of a Scarborough trampoline park following a zipline accident in January that sent a boy to hospital.

Manitoba’s 1st supervised drug consumption site may not open for months: Kinew

Kinew now says the province is taking a step back from this approach and ensuring that different health-care interventions are built within the site before opening.

How Iran oil shock is spurring a crackdown to save energy around the world

In Thailand, an order for civil servants to work from home for the foreseeable future came with another – use the stairs while the energy squeeze continues.

Saskatchewan RCMP saw almost 10K domestic violence victims in 2025

The police agency in a news release on Monday said it was continuing a trend of 'persistently high levels' of both types of interpersonal violence. 

Ford accused of limiting transparency law because of cellphone defeat in court

Ontario Premier Doug Ford saw his attempts to stop his cellphone records being partially released blocked by a panel of judges. Critics say he's changing the law as a result.

Abandoned car retrieved from ice off Nova Scotia shore by helicopter, snowmobiles

It is believed to have been left by local troublemakers, though RCMP said in an email there was no criminality involved in the situation.

Preventable cold-related deaths take toll on Ontario’s homeless population, hospital staff

Hypothermia contributed to the deaths of 62 people in 2023, with nine of them considered homeless, and 57 deaths in 2024 with 11 people listed as homeless.

Nearly 40K Toyota vehicles recalled due to ‘seats and restraints’ issue

According to Transport Canada, 'the seatback recliners for the second-row seats may not have been manufactured properly' on certain vehicles.

Teen sentenced to 3 years for arson attack at Saskatoon’s Evan Hardy high school

The teen originally pleaded not guilty in February 2025, before changing her plea in December. The Crown and defence jointly submitted a maximum youth sentence of three years.

Ontario cutting funding for 7 supervised drug consumption sites

The government in 2024 banned supervised consumption sites within 200 metres of a school or daycare, targeting 10 sites across the province for closure by the end of March 2025.

Montreal father loses nearly $20,000 in impersonation scam

A few weeks ago, Eric Sauvageau received a call from someone he believed was his son. He withdrew thousands from the bank and paid it before realizing he'd been scammed.

Nova Scotia, New Brunswick bracing for heavy rain, strong winds

The federal weather agency says most of southern and central New Brunswick and western and eastern Nova Scotia will be impacted.

Inflation fell to 1.8% in February as tax holiday clouds data, says StatCan

Consumer inflation cooled to 1.8 per cent in February compared to a year earlier, when the federal GST/HST tax holiday meant lower prices for many consumer goods and services.

© 2008 - 2026 Webjosh  |  News Archive  |  Privacy Policy  |  Contact Us