Primary Country (Mandatory)

Other Country (Optional)

Set News Language for United States

Primary Language (Mandatory)
Other Language[s] (Optional)
No other language available

Set News Language for World

Primary Language (Mandatory)
Other Language(s) (Optional)

Set News Source for United States

Primary Source (Mandatory)
Other Source[s] (Optional)

Set News Source for World

Primary Source (Mandatory)
Other Source(s) (Optional)
  • Countries
    • India
    • United States
    • Qatar
    • Germany
    • China
    • Canada
    • Singapore
    • World
  • Categories
    • National
    • International
    • Business
    • Entertainment
    • Sports
    • Special
    • All Categories
  • Available Languages for United States
    • English
  • All Languages
    • English
    • Hindi
    • Arabic
    • German
    • Chinese
    • French
  • Sources
    • India
      • AajTak
      • NDTV India
      • The Hindu
      • India Today
      • Zee News
      • NDTV
      • BBC
      • The Wire
      • News18
      • News 24
      • The Quint
      • ABP News
      • Zee News
      • News 24
    • United States
      • CNN
      • Fox News
      • Al Jazeera
      • CBSN
      • NY Post
      • Voice of America
      • The New York Times
      • HuffPost
      • ABC News
      • Newsy
      • USA TODAY
      • NBC News
      • CNBC
    • Qatar
      • Al Jazeera
      • Al Arab
      • The Peninsula
      • Gulf Times
      • Al Sharq
      • Qatar Tribune
      • Al Raya
      • Lusail
    • Germany
      • DW
      • ZDF
      • ProSieben
      • RTL
      • n-tv
      • Die Welt
      • Süddeutsche Zeitung
      • Frankfurter Rundschau
    • China
      • China Daily
      • BBC
      • The New York Times
      • Voice of America
      • Beijing Daily
      • The Epoch Times
      • Ta Kung Pao
      • Xinmin Evening News
    • Canada
      • CBC
      • Radio-Canada
      • CTV
      • TVA Nouvelles
      • Le Journal de Montréal
      • Global News
      • BNN Bloomberg
      • Métro
    • Singapore
      • CNA
      • The Straits Times
      • Lianhe Zaobao
Kingston sleeping cabin project delayed amid funding challenges

Kingston sleeping cabin project delayed amid funding challenges

Global News
Friday, September 20, 2024 10:19:18 PM UTC

The move of Kingston's sleeping cabins to Crossroads United Church has been put on hold after the organization behind the homes failed to secure operating funds.

A project to provide sleeping cabins as transitional housing in Kingston, Ont., has been put on hold after the city withdrew some financial support earlier this year, according to Our Livable Solutions (OLS).

The cabins, which have rotated between Days Road and Portsmouth Olympic Harbour for nearly three years, were set to find a permanent home behind Crossroads United Church.

But after city council voted to wind down the project in April, OLS was without funding for its operating costs.

“The approved wind-down plan has the City stepping back from direct involvement and funding of the initiative, allowing OLS the opportunity to seek a location and other non-municipal funding sources to ensure the continued operation, and housing of the cabin residents,” the statement continued.

With only capital funding from the city, Chrystal Wilson of OLS said the issue causing the Crossroads Village delay is due to a lack of funds to pay staff.

“While we can build a building and have the people in place to do it, unfortunately, we don’t have the funds to pay our staff,” she said.

The city statement added that should OLS secure the necessary operating funds within two years, it will contribute $500,000 of capital funding and sell the cabins to the organization for $1.

OLS had signed a lease agreement with Crossroads United Church to host the cabins on its underused lot. But with the project on hold, Allen Baer, a member of the church council, expressed concern for those without housing.

Read full story on Global News
Share this story on:-
More Related News
3 Canadians back home after being stranded on cargo ship in Strait of Hormouz

Three Canadians from Quebec who were stranded in the Persian Gulf since Feb. 28 have returned home following a coordinated repatriation effort.

Federal departments, agencies to shed 12,000 full-time equivalent positions

Federal departments announced that they plan to cut more than 12,000 jobs over three years as part of the Carney government’s spending review plan.

A ‘lone actor’ attack on Jewish Canadians is ‘realistic’ risk: report

Canada’s Integrated Threat Assessment Centre says the U.S.-Israeli war against Iran has heightened an already present threat against Jewish Canadians and public officials.

ICE detains B.C. mom, daughter in Texas, amid bumpy road to citizenship

Edward Warner, his wife Tania and his seven-year-old step-daughter Ayla were coming back from a friend's baby shower on Saturday when they went through an ICE checkpoint in Sarita.

Wildfire funding not sufficient in Saskatchewan budget, says fire chief

A fire chief from a village that battled flames during Saskatchewan's destructive wildfire season last year says the province's latest budget does not provide enough funding.

Manitoba’s upcoming budget to boost child care funding: finance minister

Manitoba’s upcoming budget will include more child care funding and a smaller deficit, as the NDP government aims to balance finances by 2027.

Saskatoon-born Winnipegger 1st Canadian to win World’s Strongest Firefighter

A member of the Royal Canadian Air Force in Winnipeg has just been crowned the World's Strongest Firefighter, outlifting athletes from around the world.

Canadians mark Eid al-Fitr amid ‘growing concerns’ from global tensions

Muslims across Canada are celebrating Eid al-Fitr while some reflect on conflict affecting loved ones abroad, as leaders highlight unity, charity and renewal.

Fuel, food rebates ‘would not bring down’ prices amid Iran war: economists

The Iran war has raised the price of crude oil beyond US$110 per barrel in international markets, spurring affordability concerns in Canada and around the world.

Ottawa stands by ‘Havana syndrome’ report as U.S. reconsiders foreign role

The statement from Global Affairs Canada comes a day after U.S. intelligence leaders unanimously testified that reports denying foreign involvement should be retracted.

Ontario’s winter weather drags on, but warmer days are coming

It may be the first day of spring, but Ontario’s long winter isn’t over, with more snow and icy conditions expected before a full warm-up arrives

Ford government unveils plans to ban ticket resales at higher prices

The policy is something of a reversal from a government that killed a similar idea shortly after taking power. Back in 2019, the province said the policy would be unenforceable.

Frigidaire gas ovens recalled for ‘burn hazard’ after dozens of injuries

The recall states that 'the ovens in the ranges can experience a delayed ignition of the oven's bake burner, which can create a potential risk of burns.'

2 Air Canada pilots dead after flight from Montreal crashes at LaGuardia Airport

Two Air Canada pilots are dead after their flight originating from Montreal collided with a fire truck at New York’s LaGuardia Airport Sunday night.

Crews in water-logged Metro Vancouver prepare for next drenching

With more rain in the forecast, crews continue to deal with a mudslide earlier this week that covered a road in Coquitlam in debris, posing risk to Metro Vancouver's water supply.

‘We’ll never know why’: Former CEO recalls fatal B.C. ferry sinking 20 years later

A former BC Ferries CEO says the Queen of the North sinking remains ‘disturbing’ 20 years later. The ferry struck an island in Wright Sound on March 22, 2006. Two people died.

Tumbler Ridge, B.C., and Taber, Alta. named top 2 Hockeyville finalists

The 2026 Kraft Hockeyville top two contestants have been named. The winner receives $250,000 for ice rink upgrades, and the runner-up will receive a prize worth about $100,000.

MPs to question federal budget watchdog nominee as role remains unfilled

The Office of the Parliamentary Budget Officer scrutinizes federal spending decisions and helps to cost out campaign proposals during elections.

A close-up look at the service dogs who make life better in Saskatchewan

Man’s best friend is proving to be a true lifeline. All across Saskatchewan, service dogs are providing essential, life-changing support every day.

Parts of Nova Scotia, Quebec get early spring blast of snow

Two days after the first day of spring, parts of Atlantic Canada and Quebec will see another blast of winter with Environment Canada forecasting several centimetres of snow.

UNESCO recognizes Maritime historical groups for Black Loyalist archive

UNESCO recognized several Maritime historical groups including the executive director of the Black Loyalist Heritage Centre for their work on the Black Loyalist archive.

Canadians on humanitarian mission in Cuba say residents ‘tired’ amid blackouts

Aid shipments are beginning to arrive in Cuba and a Russian oil delivery is expected this month, but fuel shortages remain critical.

Fréchette and Drainville face off in first CAQ leadership debate

Tensions flared as CAQ leadership rivals clashed over Quebec’s “third link” project in the first debate to replace Premier François Legault.

Man faces second-degree murder charge in suspicious death of Toronto woman

Toronto police have charged a 60-year-old man with second-degree murder in connection with the death of Xian Wei Shao, whose remains were discovered in a north end home last week.

ANALYSIS: Carney promised spending cuts — but not all cuts are equal

Finance Minister François-Philippe Champagne says the government has found ways to cut spending by $60 billion but cautions that published spending cuts require important context.

© 2008 - 2026 Webjosh  |  News Archive  |  Privacy Policy  |  Contact Us