Primary Country (Mandatory)

Other Country (Optional)

Set News Language for United States

Primary Language (Mandatory)
Other Language[s] (Optional)
No other language available

Set News Language for World

Primary Language (Mandatory)
Other Language(s) (Optional)

Set News Source for United States

Primary Source (Mandatory)
Other Source[s] (Optional)

Set News Source for World

Primary Source (Mandatory)
Other Source(s) (Optional)
  • Countries
    • India
    • United States
    • Qatar
    • Germany
    • China
    • Canada
    • World
  • Categories
    • National
    • International
    • Business
    • Entertainment
    • Sports
    • Special
    • All Categories
  • Available Languages for United States
    • English
  • All Languages
    • English
    • Hindi
    • Arabic
    • German
    • Chinese
    • French
  • Sources
    • India
      • AajTak
      • NDTV India
      • The Hindu
      • India Today
      • Zee News
      • NDTV
      • BBC
      • The Wire
      • News18
      • News 24
      • The Quint
      • ABP News
      • Zee News
      • News 24
    • United States
      • CNN
      • Fox News
      • Al Jazeera
      • CBSN
      • NY Post
      • Voice of America
      • The New York Times
      • HuffPost
      • ABC News
      • Newsy
    • Qatar
      • Al Jazeera
      • Al Arab
      • The Peninsula
      • Gulf Times
      • Al Sharq
      • Qatar Tribune
      • Al Raya
      • Lusail
    • Germany
      • DW
      • ZDF
      • ProSieben
      • RTL
      • n-tv
      • Die Welt
      • Süddeutsche Zeitung
      • Frankfurter Rundschau
    • China
      • China Daily
      • BBC
      • The New York Times
      • Voice of America
      • Beijing Daily
      • The Epoch Times
      • Ta Kung Pao
      • Xinmin Evening News
    • Canada
      • CBC
      • Radio-Canada
      • CTV
      • TVA Nouvelles
      • Le Journal de Montréal
      • Global News
      • BNN Bloomberg
      • Métro
438 Infrastructure Projects Face Cost Overruns Worth Rs 4.34 Lakh Crores

438 Infrastructure Projects Face Cost Overruns Worth Rs 4.34 Lakh Crores

NDTV
Sunday, November 28, 2021 01:39:01 PM UTC

A total of 438 projects in the infrastructure sector, worth more than Rs 150 crore have been affected by cost overruns totalling Rs 4.34 lakh crores

A total of 438 projects in the infrastructure sector, worth more than Rs 150 crore have been affected by cost overruns totalling Rs 4.34 lakh crores.

According to a report on infrastructure projects monitoring, released by the ministry of statistics and programme implementation (MOSPI) for the month of October 2021, out of the 1,680 such projects, 438 faced cost overruns while 539 were delayed.

The report pointed that the main reasons behind the delay in projects ranged from state-wise lockdowns due to Coronavirus pandemic, delay land acquisition and obtaining forest and environment clearances.

"Total original cost of implementation of the 1,680 projects was Rs 21,74,182.86 crore and their anticipated completion cost is likely to be Rs 26,08,330.02 crore, which reflects overall cost overruns of Rs 4,34,147.16 crore (19.97 per cent of original cost)," the report said.

Read full story on NDTV
Share this story on:-
More Related News
© 2008 - 2025 Webjosh  |  News Archive  |  Privacy Policy  |  Contact Us